| Inkster Retention Facility |

(Click for Large Image)
|
Structural concrete walls in progress for the main RTB Tank 97”x151” Elliptical pipe
stock piled ready for installation between the Effluent Junction and RTB |
| Existing Downriver Secondary Clarification UV |

(Click for Large Image) |
Tanks located in Wyandotte, MI. A major refurbishment highlighting radius concrete walls, channels and replacing the existing walls and channels made from steel. |
| Inkster Retention Facility |

(Click for Large Image) |
Structural steel and chain shoring system for existing 84” storm sewer Structural slab, walls and roof will encompass the existing pipe which will create the Effluent Junction |